Copper Hydrometallurgy

The 150m3/h nanofiltration system saves $18 million in annual cost, and recovers the original investment cost of the membrane by saving production costs and increasing metal production within 8 months.

 

i.jpg

 

The membranes are for copper production

I (2).jpg

 

(The following data is based on the assumption that the concentration of 15% mixed acid solution and acid price is $100/ton.)

 

Cost Calculation

Fixed capital investment $8,400,000
Membrane procurement $1,600,000
Operation cost (annually) $1,300,000
Total cost $11,300,000

 

Cost Savings (annually)

Save the cost of acid procurement $9,500,000
Membrane procurement $4,400,000
Other cost savings $4,100,000
Total cost saved per year $18,000,000

 

The 150m3/h nanofiltration system saves $18 million in annual cost, and recovers the original investment cost of the membrane by saving production costs and increasing metal production within 8 months. 

Project Application:  A hydrometallurgical copper mine in Africa
Capacity:  150m3/h
Annual cost savings: $18 million